Home/Resources/Videos/Thermal comfort in a steelworks
inShare on LinkedIn
Video · Industries

Thermal comfort at the Höganäs Belgium steelworks.

CFD simulation of the melting hall at the Höganäs Belgium steelworks in Ath: the warm air that builds up under the roof and the plume that rises above the furnaces.

Updated on 25 November 2026

Video
CFD simulation
Duration
2 min 33
Year
2023
Location
Ath, Belgium
Typology
Steelworks
Key takeaway

In two and a half minutes, we see where heat builds up in a melting hall and why its extraction through the roof determines operator comfort.

Key moments in the video

Click a passage to play it in the player.

What the video shows: the heat from the furnaces in the melting hall

This video comes from EOLIOS's thermal and airflow audit of the Höganäs Belgium steelworks in Ath. The site specialises in the powder metallurgy of highly alloyed powders.

In the melting hall, which houses the furnaces, we see warm air building up under the roof and the plume rising above the furnaces. Blue marks the coolest air, red the warmest.

Where does this video come from? Operator comfort in a steelworks

The aim was to lower temperatures and improve heat dissipation, particularly in the melting hall where the two furnaces are located, to increase operator comfort.

Definition · Thermal and airflow audit

An on-site diagnosis of air inlets, air movements and temperatures, often using smoke tests and a thermal camera. It then feeds and validates the simulation model.

EOLIOS identified the air inlets, carried out smoke tests and thermal camera surveys, then built a CFD model of the hall to compare two scenarios.

View the full study: thermal comfort study of the Höganäs Belgium steelworks

The video and the study

The video shows the heat in the hall. The full study compares the two scenarios and presents the solution selected to extract the heat through the roof.

View the study results: thermal comfort study of the Höganäs Belgium steelworks
FAQ

Frequently asked questions

The video, the melting hall and the link with the steelworks audit.

What exactly does this video show?

A CFD simulation of the melting hall at the Höganäs Belgium steelworks: the warm air under the roof and the plume above the furnaces.

What do the colours mean?

They represent temperature: from blue for the coolest air to red for the warmest air, above the furnaces.

Why does the roof matter so much?

Warm air rises and builds up at high level. The roof openings and extractors determine how quickly it is removed.

How was the model calibrated?

Using the on-site audit: identifying the air inlets, smoke tests and a thermal camera.

Where can I find the study results?

The comparison of scenarios and the solution selected are presented in the full study of the Höganäs Belgium steelworks.

Explore the field

Industries: continue exploring.

CFD expertise, delivered projects and technical dossiers: the whole Industries field in one place.

CFDExpert engineers
20+Countries
R&DResearch & innovation
Contact

A steelworks or a melting hall to optimise?

The easiest way is to talk it through together. Our engineers will reply with an initial technical read.